- Control and a measurement part are compact.
- An air supply part is easy for a maintenance
with package structure.
- Each channel can set up individual load and
sampling conditions.
- Over a long period of time, many stages and
load control are made.
- In an independent measurement input, a response
is quick and there is no incorrect measurement.
- The exaggerated shot just behind load and
ringing are not almost. H1204 Picture
- Since offset of a sensor is taken for every
load setup, a drift can be disregarded.
- Proofreading of load can be performed by being
arbitrarily automatic by the user using a proofreading load meter.
- Pressure, temperature, and load meter data can
be recorded, and the stability of a system can be checked.
- There is measure of primary air pressure.
- There is measure of electric power failure and
an exchange battery is cheap.
- There is little power consumption (W or
less [ Being ten channels. 150 ]).
- There is little air consumption (a part for
part a maximum of 70l./[ Being ten channels. ] for an average of 40l./).
- A function etc. can be reinforced by cheap
upgrade.
- Many of parts of an except, such as a mount and
a container, have stock, and quick repair is possible for it.
- The output of the Japanese Geotechnical Society
correspondence can be performed by offer of the PC software for
analysis.
- Since internal control pressure is as low as a maximum of 700kPa, there are a change
margin of primary air pressure and an advantage of degradation delay of use parts.
|